Body By Jake Tower 200 Installation Instructions Here
Slide the bottom frame under the lower edge of the door. You may need to use a bit of "muscle" or tilt the frame slightly to get it to click into place.
Installing the Body by Jake Tower 200 involves securing the top and bottom frames over a sturdy door and adjusting the central strap for stability. The system requires a standard door and proper alignment of the pulley rollers to ensure safe operation with the resistance cables. For detailed, step-by-step instructions, see the inSPORTline manual www.insportline.eu EN IN 3100 Doorway Pulley inSPORTline Tower 200 body by jake tower 200 installation instructions
| Problem | Likely Cause | Solution | |---------|--------------|----------| | Grinding noise when lifting | Dry guide rods | Lubricate with silicone spray | | Plates don’t stack evenly | Bent guide rod | Replace rod (contact support) | | Cable slips off pulley | Slack in cable | Tighten anchor bolt (Step 4A) | | Tower wobbles | Loose base bolts | Re-tighten M8 bolts in Step 1 | Slide the bottom frame under the lower edge of the door
Move the pulleys to their lowest position on the frame. This creates slack in the ropes, making it much easier to stretch the unit over the door. 3. Attaching the Frame to the Door The system requires a standard door and proper
Use the integrated carabiners to clip handles to your desired resistance cables.